Built for Electrical Contractors

Electrical Change Order Software for Contractors.

Turn CCDs, RFIs, specs, and quotes into takeoff-ready change orders, scope narratives, and review-ready backups.

How It Works

Upload your documents, get a priced change order with narrative, takeoff, and risk review — not a template.

Step 1

Upload Documents

Drop in CCDs, RFIs, ASIs, specs, quotes, and emails. The system extracts scope, quantities, and directives automatically.

Step 2

AI Identifies Changes

The system reads your documents against the base contract and specs to identify every scope change, with evidence references.

Step 3

Get Your Change Order

Receive a complete CO package: itemized takeoff, professional narrative, risk flags, and review log — ready for pricing and submission.

Everything You Need to Price a Change

One platform handles extraction, scope identification, takeoff, narrative, risk review, and email drafts.

Scope Narratives

Professional narratives with inclusions, exclusions, assumptions, and clarifications — ready for GC submission.

Takeoff Builder

Itemized or assembly-mode takeoff with Accubid-compatible export. Quantities sourced and verified from your documents.

Risk Scoring

Automatic risk flags for missing quantities, unclear scope, coordination gaps, and commercial exposure.

Review Log

Full audit trail of every change, revision, and decision — from first upload to final submission.

Built for Electrical Contractors Who Run Real Projects

This is not a generic document tool. It understands electrical scope — conduit, wire, devices, panels, disconnects, fire alarm, low voltage — and builds change orders the way your estimating team needs them.

  • Processes CCDs, RFIs, ASIs, specs, quotes, and emails
  • Accubid-compatible takeoff export (CSV + TSV)
  • Professional scope narratives with inclusions and exclusions
  • Automatic risk flags for missing data and coordination gaps
  • Full review log and audit trail for every CO
  • Spec vault with intelligent search across project specs
Change Order Package
Westfield Medical Center — CO #4
9 change items identified from 4 documents
38
Takeoff Items
3
Risk Flags
Narrative Preview

"Provide and install (4) new 20A/1P circuits from Panel DP-3 to new duplex receptacles in Lab Suite B, per CCD-017 dated 2/10/2026. Includes EMT conduit, #12 THHN wire, device boxes, and receptacles..."

Ready to Build Change Orders Faster?

Upload your first CO documents and see what you get. No credit card required to start.